The Walter Road project was a design & construct contract for the renewal of a 2km section of DN460RC distribution water main located in Perth from the intersection of Beechboro Road and Walter Road to [...]
Sydney Water Sewer Extension in Beacon Hill, NSW
Serkan Erarslan2016-11-09T09:47:33+11:00Sydney Water’s Delivery Management team has recently completed a service extension to connect properties at Beacon Hill to the existing waste water system. Sydney Water’s Site Supervisor Tim Kay, made note that he has received [...]
Berolina and Tunneline – Mt Ousley
Serkan Erarslan2016-04-29T14:33:05+10:00Combining traditional tunneling technology with modern day rehabilitation techniques enabled Downer PipeTech to submit and provide a solution to RMS [Roads and Maritime Services] to extend the life of an existing set of culverts that crossed the M1/ Princes Highway outside [...]
Tunneline – Oodla Wirra
ITS Media Room2016-04-08T13:55:07+10:00Downer PipeTech were engaged by Transfield Services, who are the facilities manager for ARTC to design and install structural solution to this under track culvert that was showing advanced signs of decay with large patches [...]
Sliplining – North Burdekin
Guy2017-04-20T11:18:53+10:00Downer PipeTech were engaged by the North Burdekin Water Board to rehabilitate two reinforced concrete pipelines that delivered water from The Rocks pump station, alongside the Burdekin River into Sheep Station Creek. The two pipelines [...]
Pressureline – Adelaide CBD
Guy2017-04-20T11:18:53+10:00Downer PipeTech offer Pressureline (formerly Swagelining™) as a rehabilitation process for the renewal of pressure and non-pressure pipelines in water, sewer and industrial applications. This is the second project for SA Water having also completed [...]
Berolina CIPP Lining – Kiama Bends
Guy2017-04-20T11:18:53+10:00The NSW Roads & Maritime Services (RMS) had identified that two 60 metre 900mm corrugated steel culverts under the Princes Highway at the Kiama bends needed to have the structural integrity of the culverts reinstated. [...]
Pipebursting – Blue Mountains
Guy2017-04-20T11:18:53+10:00This project involved the upsizing of the existing sewer network within the community of Blackheath using pipe bursting techniques. The objective of the project was to replace the sewer lines with upsized pipes to alleviate [...]
Robotics – Sydney Olympic Park
ITS Media Room2016-04-08T14:34:11+10:00To ensure sports fans aren’t inconvenienced SOPA choose Downer PipeTech The Sydney Olympic Park Complex is served by a comprehensive storm water drainage system that covers all road, parkland and building drainage needs for [...]