Downer PipeTech was engaged by Sydney Trains to repair a 27 metre long brick arch culvert. The need for remediation for this culvert was due to the brick arch that was starting to crack and [...]
Berolina – Storm water Stack and Pipe Rehabilitation, NSW
Serkan Erarslan2016-05-24T15:17:46+10:00Downer PipeTech were engaged by Manly Council to undertake repair and remediation works to Storm water infrastructure within private property along the Manly waterfront. Specific considerations that were sensitive to this site included the environmental [...]
Berolina and Tunneline – Mt Ousley
Serkan Erarslan2016-04-29T14:33:05+10:00Combining traditional tunneling technology with modern day rehabilitation techniques enabled Downer PipeTech to submit and provide a solution to RMS [Roads and Maritime Services] to extend the life of an existing set of culverts that crossed the M1/ Princes Highway outside [...]
Berolina CIPP Lining – Kiama Bends
Guy2017-04-20T11:18:53+10:00The NSW Roads & Maritime Services (RMS) had identified that two 60 metre 900mm corrugated steel culverts under the Princes Highway at the Kiama bends needed to have the structural integrity of the culverts reinstated. [...]